Project Robus is a search for vulnerabilities in ICS/SCADA protocol stack implementations. Most research and commercial tools to date have focused on the PLC/RTU/controller (server). Project Robus tests the implementation of the master (client) side of the DNP3 protocol stack implementations. Attacking the DNP3 master in the control center can eliminate the ability to monitor and control an entire SCADA system, such as an entire electric transmission or distribution system … all from accessing a serial or IP connection in one unmanned substation. The session will include: - an introduction to response fuzzing in both IP and serial communication - an analysis of master and outstation failures in the leading DNP3 protocol stacks - the importance of serial communications in the analysis of the electronic security perimeter - details on the Project Robus fuzzing test cases - analysis why other ICS fuzzing efforts didn’t discover these vulnerabilities - demonstrations of the most interesting and important vulnerabilities Finally Adam and Chris will broadly classify vendor responses based on a number of criteria such as, time to patch, customer notification, cooperative attitude, and overall security posture.